wasnt looking to buy a bike anytime soon but it was a offer i couldnt have refused. long story short. guy had it, dumped it, his girl told him to sell it or shes leaving, he sold it to me as is. I have been looking for a track bike but didnt think id get one this soon. His original plan was to part it out so when i recieved it, it was in pieces. tank, subframe, most of the electrical was disconnected. I was taking a chance because i had no way to know if the motor was any good. the frame is crack free and so is the subframe so i bit the bullet and picked it up. took it to my buddies house and put about 2 hrs into putting stuff on (bs'ed alot also) connected all the electrical a vuala! fired up on the second go around! how it looked when we first got it running.
whats done:
-all eletrical in working order
-rearsets put back on and adjusted
-front brakes put back on and blead
-subframe put back on w/ passenger pegs
Things that need to be done:
-body work (put on what i have)
-look for lower fairings (both sides)
-find out where all these bolts go.
-further cleaning
-forkseals redone
-tuck electrical where it belongs
any and all suggestions help. never worked on this bike before, and will definetly have alot of questions.
whats done:
-all eletrical in working order
-rearsets put back on and adjusted
-front brakes put back on and blead
-subframe put back on w/ passenger pegs
Things that need to be done:
-body work (put on what i have)
-look for lower fairings (both sides)
-find out where all these bolts go.
-further cleaning
-forkseals redone
-tuck electrical where it belongs
any and all suggestions help. never worked on this bike before, and will definetly have alot of questions.